Transparency

NAPOCOR Transparency Seal

links

      MOR  DOR  Report Archives 

      Telemetry  PR Tracking System  Web Mail

      news archives  procurement  job vacancy

                      SPUGMapIcon

                         SPUG MAP

                     NPC Facebook Page

                  Like us on Facebook

energy

      doe  erc logo   nea

            

NPC-SPUG CY 2017 UCME
PETITION FILED WITH THE ERC
By: Demetrio M. Granada, Jr.

The NPC-SPUG CY 2017 UCME Petition has been filed and docketed on 26 May 2016 under ERC Case No. 2016-134RC.

The proposed basic UCME for CY 2017 of PhP 0.1248/kWh (inclusive of Cash Incentive to RE Developer of PhP 0.0030/kWh) will replace the existing provisionally ERC-approved NPC basic UCME rate of PhP 0.1163/kWh for NPC-SPUG, NPPs/QTPs and for Renewable Energy Developers-Cash Incentive (RED-CI).

The CY 2017 proposed basic UCME will purposely finance the operation of NPC-SPUG, NPPs/QTPs subsidy and RED-CI.

Proposed CY 2017 UCME & Rates

UCME Petition2017

The Universal Charge (UC)--one of which is for Missionary Electrification (ME)--is a non-by passable charge that is collected from all end-users on a monthly basis by the Distribution Utilities. The UCME is also utilized to electrify off-grid areas or missionary areas that are not connected to the main transmission grid.

Click here to download the application ERC Case No. 2016-134

 

 

 

 

anivlogo

    80th

calendar