where to buy adidas yeezy 350 boost v2 black copper red green buy adidas yeezy boost 350 v2 black white online adidas yeezy boost 350 v2 blackred adidas eqt support adv turbo pink available now adidas eqt support adv turbo pink adidas eqt support adv turbo pink adidas eqt support adv sub green available now adidas eqt support adv core black turbo red new adidas eqt adv support will release classic green accented color scheme adidas eqt support adv clear brown white adidas eqt support adv footwear white available now adidas eqt support adv grey burnt orange adidas eqt support adv support burnt orange grey adidas adv support burnt orange adidas eqt support adv camo pack adidas eqt support adv adidas eqt adidas eqt support adidas debuts springsummer 2017 eqt collection due january 26th adidas originals eqt support rf frozen green vintage white

Transparency

NAPOCOR Transparency Seal

links

      MOR  DOR  Report Archives 

      Telemetry  PR Tracking System  Web Mail

      news archives  procurement  job vacancy

                      SPUGMapIcon

                         SPUG MAP

                     NPC Facebook Page

                  Like us on Facebook

energy

      doe  erc logo   nea

            

Workshop on Planning and Forecasting for Missionary Electrification (Western Mindanao Area) – 2017
By: Demetrio M. Granada, Jr.

planningwmod

After the successful conduct of the CY 2017 Stakeholder's Forum for Missionary Electrification in Western Mindanao Area on 24 January 2017 at the Garden Orchid Hotel in Zamboanga City, NPC, followed it up with its Workshop on Planning and Forecasting on the next day, 25 January 2017.

The workshop focused on the power supply requirements to support the economic development of the areas and was attended by various planners from Local Government Units (LGUs) and Distribution Utilities (DUs) from Western Mindanao areas under NPC-SPUG.

The workshop objectives were as follows:

  • Harmonize all incoming electrical loads from the LGUs and DUs in order for NPC to have realistic projections on the additional power supply in the area to accommodate the increasing demand and additional connections; and to sustain a stable, adequate and reliable power supply:
  • Review the Power Supply Agreement (PSA) per area, if there is a need for amendment based on the projections.
  • Identify areas (barangay) for electrification and determine the timeline of implementation and inclusion in the Missionary Electrification Plan (MEP).

The planners from LGUs and DUs provided data of their incoming loads and identify areas for electrification while NPC team processed the data.

The final result was the 5-year forecast that will be incorporated in the MEP.

 

 